Finally getting car back together after a 2 year engine build. Had a lot of extensive work done by VAC on motor which includes closed deck block, stage 4 head with plugged ports and larger exhaust valves (more modifications than standard stage 3 head), 268 high lift Schrick cams with Ferrera valve train and new vanos spools.